I-70 Bridge Rehab Deer Trail

Project Info

Client Colorado Dept. of Transportation

Project Description

I-70 Bridge Rehab Deer Trail

Denver, Colorado

Start Date: March 2016
End Date: November 2016

colorado_denver

This bridge rehabilitation project extended the life of the Deer Trail Bridge. An innovative polyester concrete overlay was used to preserve the bridge deck for more than 20 years, a longer duration than that of a normal overlay.

Hamilton’s work on this bridge replacement included the rehabilitation of all bridge piers and pier caps on the 486-foot bridge parallel to I-70. In addition the six-span bridge deck, approach panel, curb and rail were also replaced. The second portion of the project included a scour repair, channel realignment, and
a 130-foot by 12-foot low-water crossing with toewalls.